Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Don't miss the next one. BidFox emails you every morning the new construction notices in Illinois that fit your business. 7 days free, cancel online anytime.
| Agency | Department of Energy |
| Contracting office | Fermilab - DOE Contractor |
| Place of performance | Batavia, IL |
| Type of notice | Open for bids |
| Set-aside | No Set aside used |
| Response deadline | Dec 17, 2026 |
| Posted | Nov 19, 2026 |
| Solicitation number | RFP-376508-CD |
| NAICS code | 236210, Industrial Building Construction |
Change history
4 changes between the versions of this notice on SAM.gov, newest first.
-
Description updated
- Description text changed
-
Deadline extended
- Deadline extended from Nov 17, 2026 to Dec 17, 2026
- Description text changed
-
Description updated
- Description text changed
-
Description updated
- Description text changed
From the daily public SAM.gov data. That data doesn't list attachments, so open the official notice to download new or revised documents. All recent amendments.
Summary from the notice
On November 19, 2026, Amendment No. 4 was issued to provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates. On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026. On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supe…
Other open NAICS 236210 notices
| Deadline | Notice | Set-aside |
|---|---|---|
| Nov 30 8 days left |
Multiple Award Construction Contract (MACC)
Department of the Air Force, Bolling AFB, DC Sources sought |
Open to all |
| Nov 30 8 days left |
IE181 - WHS Greenhouse Construction
Bureau of Indian Affairs, Ft. Wingate, NM |
Open to all |
| Dec 1 9 days left |
15EX 8-Bay Maintenance Hangar Complex-Industry Day
Department of the Army, Harrison Township, MI Special notice |
Open to all |
| Dec 3 11 days left |
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Department of the Air Force, Tinker AFB, OK |
Small business (partial) |
| Dec 10 18 days left |
NNSY DD4 Duct Insulation Replacement
Department of the Navy |
Open to all |
| Dec 10 18 days left |
Travis AFB MACC
Department of the Air Force, Travis AFB, CA Sources sought |
Small business |
Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.