FY26 Willapa Harbor Maintenance Dredging
| Agency | DEPT OF DEFENSE DEPT OF THE ARMY |
| Contracting office | W071 ENDIST SEATTLE |
| Where | WA |
| Type of notice | Pre-solicitation |
| Set-aside | No Set aside used |
| Response deadline | Nov 5, 2028 |
| Posted | Oct 17, 2025 |
| Solicitation number | W912DW26Z1ATA |
| NAICS code | 237990 |
Summary from the notice
PRE-SOLICITATION NOTICE This Synopsis/Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Synopsis/Pre-Solicitation should be submitted in writing to the Point of Contact(s) indicated below. Construction Project: FY26 Willapa Harbor Maintenance Dredging Pre-solicitation Notice Number: W912DW26Z1ATA The magnitude of construction is estimated to be between $5,000,000 and $10,000,000. The resulting contract will be firm-fixed-price. FY26 Willapa Harbor Maintenance Dredging Project Details: USACE Seattle District has a need for a construction dredging, project entitled FY26 Willapa Harbor Maintenance Dredging, Willapa Harbor, WA at three federal navigation features in Willapa Bay, Washington: (1) the entrance to Tokeland Marina; (2) the entrance channel to Nahcotta; and (3) the Bay Center entrance channel and basin. The work is anticipated to begin in July 2026 and all in-water work must be completed by 15 Feb 2027. The project will require dredging via mechanical (clamshell) means to remove approximately 180,000 CY of accumulated sediment across the three project features. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft MLLW (Tokeland). In addition, dredging of approximately 10,000 CY may be required to a minimum depth of -9 ft MLLW in the Palix River thalweg to ensure sufficient water depths for the dredge, scow, and tugboats to transit to/from Bay Center and t…
Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.