Fort Pierce Harbor Maintenance Dredging, ST. Lucie County, Florida
This notice is closed. Open ones like it: All construction contracts or the 6 open NAICS 237990 notices below.
Get the next one like this first. BidFox emails you every morning the new construction notices that fit your business. 7 days free, cancel online anytime.
| Agency | Department of Defense Department of the Army |
| Contracting office | W074 Endist Jacksnvlle |
| Place of performance | See the notice |
| Type of notice | Open for bids |
| Set-aside | None, open to all businesses |
| Response deadline | Oct 16, 2026 |
| Posted | Oct 20, 2026 |
| Solicitation number | W912EP26BA015 |
| NAICS code | 237990, Other Heavy and Civil Engineering Construction |
Summary from the notice
PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being placed onto Fort Pierce Beach. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the drawings. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty pumpout location. Work also includes but is not limited to environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring. Work will be divided into a base and two options. BIDS DUE: 16 October 2026 at 1:00 PM EDT. NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION. SMALL BUSINESS SIZE STANDARD: $37 million. TARGET PRICE RANGE: Between $5,000,000.00 and $10,000,000.00. PERIOD OF PERFORMANCE: The Contractor shall be required to (a) commence work under this contract within SIXTY (60) calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use, and be off the beach, not later than 30 May 2027, with 30 June 2027 for the entire contract work. The time stated for completion shall include final cleanup of the premises. The com…
Other open NAICS 237990 notices
Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.