Everglades National Park, Flamingo Marina Bulkhead Rehabilitation Monroe County, Florida
| Agency | Department of Defense Department of the Army |
| Contracting office | W074 Endist Jacksnvlle |
| Place of performance | Homestead, FL |
| Type of notice | Open for bids |
| Set-aside | None, open to all businesses |
| Response deadline | May 15, 2026 |
| Posted | May 13, 2026 |
| Solicitation number | W912EP25RA006 |
| NAICS code | 237990, Other Heavy and Civil Engineering Construction |
Summary from the notice
PROJECT TITLE: EVERGLADES NATIONAL PARK, FLAMINGO MARINA BULKHEAD REHABILITATION MONROE COUNTY, FLORIDAPROJECT LOCATION: MONROE COUNTY, FLORIDADescription of Work: The project work includes the removal of the existing concrete cap of the bulkhead walls, installation of new steel sheet pile bulkhead walls with cast-in-place concrete cap and precast concrete wall panel cap, site grading, and mechanical/plumbing/electrical equipment replacements and additions, and storm water outfall pipe extensions. The work also includes the removal and replacement of the asphalt/concrete pavement, timber guide and mooring piles, floating docks and aluminum ramps (where indicated on the plans), and modification of the fixed docks. The overall project site components encompass work to done within and around the four marina basins (Whitewater Bay, Florida Bay, Visitor Center Bay, and Maintenance Marina Bay) located at the Flamingo Marina in the Everglades National Park. Shallow draft barges or similar is authorized, with approval by the Government, for use so long as dredging of the basins is not required, at no additional cost to the Government.Project Location: The project is located at the Flamingo Marina in the Everglades National Park (ENP) in Monroe County, Florida. The exact location will be shown by the Contracting Officer.The project consists of a base and six options.Project will include Project Labor Agreement (PLA).The anticipated Period of Performance is 1,350 calendar days from iss…
Other open NAICS 237990 notices
| Deadline | Notice | Set-aside |
|---|---|---|
| Oct 22 Closes today |
Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB
Department of the Army, Norfolk, VA Special notice |
Open to all |
| Oct 21 Closes today |
Ridges Basin Gate Hydraulics Mod
Bureau of Reclamation |
Open to all |
| Oct 21 Closes today |
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Department of the Army, Port Monmouth, NJ |
Open to all |
| Oct 21 Closes today |
Upper Wicomico River Dredging Project, Wicomico County, MD
Department of the Army Pre-solicitation |
Small business |
| Oct 22 1 day left |
Craney Island Rehandling Basin Dredging
Department of the Army, Portsmouth, VA Sources sought |
Open to all |
| Oct 22 1 day left |
Maintenance Dredging of the Winter Harbor Federal Navigation Channel
Department of the Army, Onemo, VA Sources sought |
Open to all |
Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.