Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
| Agency | Department of Defense Department of the Army |
| Contracting office | W071 Endist Portland |
| Place of performance | Cascade Locks, OR |
| Type of notice | Pre-solicitation |
| Set-aside | Small Business Set Aside - Total |
| Response deadline | Sep 18, 2026 |
| Posted | Aug 19, 2026 |
| Solicitation number | W9127N26BA024 |
| NAICS code | 237310, Highway, Street, and Bridge Construction |
Summary from the notice
The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lea…
Other open NAICS 237310 notices
| Deadline | Notice | Set-aside |
|---|---|---|
| Oct 21 Closes today |
OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
Federal Highway Administration, Hood River, OR |
Small business |
| Oct 21 Closes today |
Repair Storm Damage Imperial Dam Road at YPG, AZ
Department of the Army Sources sought |
Open to all |
| Oct 22 1 day left |
Helena - Lewis and Clark National Forest Dry Pole Pit Rock Crushing Service
Forest Service, Stanford, MT |
Small business |
| Oct 22 1 day left |
Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest Service
Forest Service, Tres Piedras, NM Special notice |
Small business |
| Oct 22 1 day left |
Driveway & Parking Lot Sealcoating and Striping
National Oceanic and Atmospheric Administration |
Small business |
| Oct 23 2 days left |
Rocky MTN Arsnl Nwr-patch Hill Road
US Fish and Wildlife Service |
Open to all |
Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.