Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Closed Open for bids Open to all NAICS 236210
AgencyDepartment of Energy
Contracting officeFermilab - DOE Contractor
Place of performanceBatavia, IL
Type of noticeOpen for bids
Set-asideNo Set aside used
Response deadlineNov 17, 2026
PostedSep 17, 2026
Solicitation numberRFP-376508-CD
NAICS code236210, Industrial Building Construction

Read the official notice on SAM.gov

Summary from the notice

This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion o…

Other open NAICS 236210 notices

DeadlineNoticeSet-aside
Oct 28
7 days left
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Department of the Air Force, Tinker AFB, OK
Small business (partial)
Oct 29
8 days left
Construction Contract Sources Sought
Department of Energy
Open to all
Nov 2
12 days left
Building 215 Clean Room HEPA Filter Replacement
National Institute of Standards and Technology, Gaithersburg, MD Special notice
Open to all
Nov 17
27 days left
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Department of Energy, Batavia, IL
Open to all
Nov 18
28 days left
Sources Sought - Post Test Lithium Battery Storage
Department of the Navy Sources sought
Open to all
No deadline Construct Toc Pad - Arlington Heights Il - Award
Department of the Army
8(a)

Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.