BidFox

621-24-701 EHRM Infrastructure Upgrades Tier 3 Data Center Construction - Mountain Home VAMC

Closed Open for bids SDVOSB set-aside NAICS 236220
AgencyDepartment of Veterans Affairs
Contracting officePcac (36c776)
Place of performanceMountain Home, TN
Type of noticeOpen for bids
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Response deadlineApr 2, 2026
PostedMar 25, 2026
Solicitation number36C77626B0006
NAICS code236220, Commercial and Institutional Building Construction

Read the official notice on SAM.gov

Summary from the notice

The Mountain Home VAMC is seeking a general contractor to coordinate all design efforts to relocate the main computer room (MCR) on Floor 3 of Building 77 located at James H. Quillen VA Medical Center (JHQVAMC) and make it compliant with VA standards for a Tier 3 data center. The area of work for this project will occur within rooms 3A109 (existing MCR), 3A112, 3A112A, 3A112D, 3A113, 3A113A, and 3A212. Work will include providing redundant power distribution, computer room cooling and distribution, replacement of aged equipment, grounding and bonding, cable management, and new fiber and copper to the new MCR. A new clean-agent system will be provided, as well as a new fire rated assembly within the new MCR, ensuring that all penetrations are sealed appropriately. A new space will be provided in room 3A112A to host cylinder storage for the clean agent system.

Other open NAICS 236220 notices

DeadlineNoticeSet-aside
Oct 21
Closes today
Detection Sciences Testing and Applied Research (DSTAR)
Department of the Army, NJ Sources sought
Open to all
Oct 21
Closes today
EIE485 Consolidated Munitions on Quarry Hill, Eielson AFB, AK
Department of Defense, Eielson AFB, AK Special notice
Open to all
Oct 21
Closes today
EOIR Schwartz FOB Courtroom Painting
Public Buildings Service, San Diego, CA Pre-solicitation
Small business
Oct 21
Closes today
Fire Station, Building 806, Buckley Space Force Base, CO 80011
Department of the Army, Aurora, CO Sources sought
Open to all
Oct 21
Closes today
GAOA Red Rock Lookout Renovation, Plumas National Forest
Forest Service, Quincy, CA
Small business
Oct 21
Closes today
ICE HSI Schwartz 2nd Floor Window Coverings
Public Buildings Service, San Diego, CA Pre-solicitation
Small business

Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.