621-24-701 EHRM Infrastructure Upgrades Tier 3 Data Center Construction - Mountain Home VAMC
| Agency | Department of Veterans Affairs |
| Contracting office | Pcac (36c776) |
| Place of performance | Mountain Home, TN |
| Type of notice | Pre-solicitation |
| Set-aside | Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) |
| Response deadline | Mar 10, 2026 |
| Posted | Jan 29, 2026 |
| Solicitation number | 36C77626B0006 |
| NAICS code | 236220, Commercial and Institutional Building Construction |
Summary from the notice
The Mountain Home VAMC is seeking a general contractor to coordinate all design efforts to relocate the main computer room (MCR) on Floor 3 of Building 77 located at James H. Quillen VA Medical Center (JHQVAMC) and make it compliant with VA standards for a Tier 3 data center. The area of work for this project will occur within rooms 3A109 (existing MCR), 3A112, 3A112A, 3A112D, 3A113, 3A113A, and 3A212. Work will include providing redundant power distribution, computer room cooling and distribution, replacement of aged equipment, grounding and bonding, cable management, and new fiber and copper to the new MCR. A new clean-agent system will be provided, as well as a new fire rated assembly within the new MCR, ensuring that all penetrations are sealed appropriately. A new space will be provided in room 3A112A to host cylinder storage for the clean agent system.
Other open NAICS 236220 notices
| Deadline | Notice | Set-aside |
|---|---|---|
| Oct 21 Closes today |
Detection Sciences Testing and Applied Research (DSTAR)
Department of the Army, NJ Sources sought |
Open to all |
| Oct 21 Closes today |
EIE485 Consolidated Munitions on Quarry Hill, Eielson AFB, AK
Department of Defense, Eielson AFB, AK Special notice |
Open to all |
| Oct 21 Closes today |
EOIR Schwartz FOB Courtroom Painting
Public Buildings Service, San Diego, CA Pre-solicitation |
Small business |
| Oct 21 Closes today |
Fire Station, Building 806, Buckley Space Force Base, CO 80011
Department of the Army, Aurora, CO Sources sought |
Open to all |
| Oct 21 Closes today |
GAOA Red Rock Lookout Renovation, Plumas National Forest
Forest Service, Quincy, CA |
Small business |
| Oct 21 Closes today |
ICE HSI Schwartz 2nd Floor Window Coverings
Public Buildings Service, San Diego, CA Pre-solicitation |
Small business |
Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.