Electric Power Resiliency Building 56
Don't miss the next one. BidFox emails you every morning the new construction notices that fit your business. 7 days free, cancel online anytime.
| Agency | Department of Defense Defense Logistics Agency |
| Contracting office | DLA Distribution |
| Place of performance | See the notice |
| Type of notice | Open for bids |
| Set-aside | Small Business Set Aside - Total |
| Response deadline | Dec 9, 2026 |
| Posted | Nov 16, 2026 |
| Solicitation number | SP330027Q0012 |
| NAICS code | 238210, Electrical Contractors and Other Wiring Installation Contractors |
Change history
3 changes between the versions of this notice on SAM.gov, newest first.
-
Description updated
- Description text changed
-
Description updated
- Description text changed
-
Description updated
- Description text changed
From the daily public SAM.gov data. That data doesn't list attachments, so open the official notice to download new or revised documents. All recent amendments.
Summary from the notice
Amendment 0003 is being issued to change the original SF1449 cover page to correct Block 8 from 12/07/2026 to 12/09/2026 as provided for in the rest of the solicitation. Amendment 0002 is being issued to correct faulty upload of Attachment 2.Amendment 0001 is being issued to add Attachment 2, which is the Statement of Work. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at the Defense Distribution San Joaquin California. Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaic system for building 56. but not limited to: The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed the listing and qualification tests. All design and installation shall comply with the most recent version of each document. The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor. The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistent with and adhere to all California Building Codes and standards, th…
Other open NAICS 238210 notices
| Deadline | Notice | Set-aside |
|---|---|---|
| Nov 23 1 day left |
Automatic Transfer Switch (ATS) Preventive Maintenance and Repair Services, and Isolation Power Panel Inspection
Department of Veterans Affairs, KS |
Open to all |
| Nov 23 1 day left |
Contractor to Relocate Customer Repeater system and complete tasks listed on the attached Scope of Work (SOW) at the Watervliet Arsenal, NY.
Department of the Army |
Small business |
| Nov 23 1 day left |
Electrical Substation Maintenance and Repairs
Department of the Army, Fort Buchanan, PR Pre-solicitation |
Small business |
| Nov 24 2 days left |
Electrical Wiring Install
Defense Health Agency (dha), Portsmouth, VA |
Small business |
| Nov 24 2 days left |
Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction
Department of Veterans Affairs, Brooklyn, NY |
Small business |
| Nov 25 3 days left |
Installation of Proximity Sensors for Automatic Doors
Department of Veterans Affairs |
Open to all |
Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.