Government Requirement for Advanced Power and Energy (GRAPE)
| Agency | Department of Defense Department of the Air Force |
| Contracting office | Fa8650 Usaf Afmc Afrl Pzl Afrl/pzl |
| Place of performance | See the notice |
| Type of notice | Pre-solicitation |
| Set-aside | None, open to all businesses |
| Response deadline | Jul 9, 2024 |
| Posted | May 28, 2024 |
| Solicitation number | FA8650-18-S-5008 |
| NAICS code | 541715, Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
Summary from the notice
To employ new battery-based electric flightline support equipment and vehicles, charging infrastructure must be installed. A Phase 1 Flightline Electrification Charging Infrastructure Study was conducted at Holloman AFB and Robins AFB to prepare the government for a Phase 2 Demonstration at these sites. The purpose of the Phase 2 Demonstration effort is to install charging infrastructure and conduct a demonstration at these sites to define charging standards, operational approaches, technologies, and risks. This learning will enable a smoother and faster transition to a future Phase 3 wide-spread implementation effort.
Other open NAICS 541715 notices
Details copied from the public SAM.gov notice. BidFox is not connected to SAM.gov or the U.S. Government, so check the official notice before you bid.