Federal contracts from $15,000 to $350,000 are reserved for small businesses
Every federal purchase above the $15,000 micro-purchase threshold and up to the $350,000 simplified acquisition threshold is set aside for small businesses by default. The rule is FAR 19.502-2(a); the dollar figures are in FAR 2.101 and were raised from $10,000 and $250,000 on October 1, 2025. Large companies can only compete in this range when the contracting officer decides there will not be two small businesses able to quote.
If you read "$10,000 to $250,000" somewhere, it is out of date. Those were the thresholds from October 2020 to September 2025. The FAR Council adjusts them for inflation every five years; the current figures are $15,000 and $350,000, and the next scheduled adjustment is October 1, 2030. We checked the live text of FAR 2.101 on acquisition.gov on October 27, 2026 (FAC 2026-01).
Today, November 22, 2026: SAM.gov has 11,692 open federal notices. 3,298 carry a total or partial small business set-aside, and 3,936 of all open notices close within 7 days. Browse the open small business set-asides by state and NAICS code.
What the rule says
FAR 19.502-2 has two parts, and the first one is the strongest preference small businesses get anywhere in federal contracting:
| Value of the purchase | What the contracting officer must do | Source |
|---|---|---|
| Up to $15,000 | Micro-purchase: no competition required, usually paid with a government purchase card, no set-aside rule. | FAR 13.203 |
| Over $15,000 and up to $350,000 | Automatically set aside for small businesses, unless the contracting officer determines there is not a reasonable expectation of offers from two or more responsible small businesses that are competitive on price, quality and delivery. | FAR 19.502-2(a) |
| Over $350,000 | Set aside when market research gives a reasonable expectation of offers from at least two responsible small businesses at fair market prices. The burden is the other way round: the small businesses have to be shown to exist first. | FAR 19.502-2(b) |
Three details that matter in practice:
- One offer is enough to win. If the contracting officer receives only one acceptable offer from a responsible small business, the rule says they should generally award to that firm.
- No offers withdraws the set-aside. If no acceptable offer comes from a small business, the set-aside is withdrawn and the requirement, if it still exists, is resolicited open to all. Every small job you skip can end up with a large company.
- The socioeconomic programs can take its place. In the same range the contracting officer may award under the 8(a), HUBZone, SDVOSB or WOSB programs instead of a total small business set-aside; there is no order of precedence among those programs (FAR 19.203). See how to get 8(a), HUBZone, WOSB and SDVOSB certification.
The lower limits for construction and services
The $15,000 floor is the general micro-purchase threshold. FAR 2.101 sets a lower one for two kinds of work, so the reserved range starts earlier:
| Type of work | Reserved range | Why |
|---|---|---|
| Construction subject to Davis-Bacon wage rates | $2,000 to $350,000 | Micro-purchase threshold for construction is $2,000. Bonds come in on top: alternative payment protection from $35,000 and Miller Act bonds over $150,000. See bonds and prevailing wages. |
| Services covered by the Service Contract Labor Standards (janitorial, grounds, guards, food service...) | $2,500 to $350,000 | Micro-purchase threshold for covered services is $2,500, and the contract comes with a wage determination. |
| Supplies, equipment, IT, professional services | $15,000 to $350,000 | General thresholds. |
| Purchases supporting contingency operations, emergencies and major disasters | $25,000 to $1 million inside the U.S. | Higher thresholds in FAR 2.101 for these cases ($40,000 and $2 million outside the U.S.). |
How much of the federal market this is
We counted every award notice posted on SAM.gov in the 12 months to October 27, 2026 that published a value, one per solicitation number. The result:
| Published award value | Award notices | Share |
|---|---|---|
| $15,000 or less | 837 | 1% |
| Over $15,000 and up to $350,000 | 52,768 | 86% |
| Over $350,000 | 7,523 | 12% |
| Total with a published value | 61,128 | 100% |
So 86 of every 100 awards announced on SAM.gov with a value fall inside the reserved range. The median award in the range was $78,622. In dollars the picture flips: those 52,768 awards add up to about $7.7 billion, around 2% of the $373 billion published in the same 12 months. The small end of the market is where the volume is, not the money.
Two caveats so you read these numbers correctly. First, not every award is published as an award notice on SAM.gov, so this is the visible part of the market, not all of it. Second, the count is heavy with Defense Logistics Agency spare-parts buys: the NAICS codes with the most awards in the range were aircraft parts (336413, 3,317 awards), industrial valves (332911, 2,701), hardware (332510, 2,581), bolts, nuts and screws (332722, 2,389) and electronic components (334419, 2,054). Many of those notices do not list a place of performance or a set-aside code, so we cannot say from the award notice alone whether each one was set aside.
Where the open ones are today
These are open total small business set-asides in construction and services that you can still bid on, from today's SAM.gov data, soonest deadline first (spare-parts buys with no place of performance are left out). The solicitation says whether the job is a simplified acquisition; the notice itself does not publish an estimated value.
| Deadline | Notice | Set-aside |
|---|---|---|
| Nov 24 2 days left |
1305M327Q0026 - Snow Removal, Negaunee, Mi
National Oceanic and Atmospheric Administration, Negaunee, MI |
Small business |
| Nov 24 2 days left |
Base Cape Cod & Harwich Housing Refuse & Recycling
US Coast Guard, Buzzards Bay, MA |
Small business |
| Nov 24 2 days left |
Electrical Wiring Install
Defense Health Agency (dha), Portsmouth, VA |
Small business |
| Nov 24 2 days left |
Emergency and Rapid Response Services VI (ERRS)
Environmental Protection Agency, Chicago, IL |
Small business |
| Nov 24 2 days left |
Missouri River Recovery Implementation Committee Chair Professional Services US Army Corps of Engineers (USACE) Missouri River Recovery Program (MRRP)
Department of the Army, Omaha, NE |
Small business |
| Nov 24 2 days left |
Mud Mountain Dam Sewage Lagoon Repair
Department of the Army, Enumclaw, WA |
Small business |
More: all open small business set-asides, or by state, for example South Carolina, Maryland, Florida, California and Texas. Each state page and each NAICS page shows how many open notices carry a set-aside.
How these purchases are bought
- Simplified procedures. At or below $350,000 agencies use FAR part 13: a request for quotations (RFQ) or a combined synopsis/solicitation, evaluation on price or price plus a couple of factors, no formal source selection. A quotation is not an offer: the contract forms when the government issues the order and you accept it (FAR 13.004).
- Posted on SAM.gov only above $25,000. Between $15,000 and $25,000 the agency displays the opportunity publicly for at least 10 days, not necessarily online (FAR 5.101). In that band the buyers quote the vendors they already know.
- Short response times. For actions over $25,000 and up to $350,000 the contracting officer sets "a reasonable opportunity to respond", with no fixed minimum (FAR 5.203). A week is common; a few days happens.
- Not on GSA Schedule orders. Orders placed against the GSA Multiple Award Schedule follow FAR 8.4, where setting an order aside is at the ordering agency's discretion (FAR 8.405-5). The automatic reservation applies to open-market purchases.
How to get them: a short plan
- Be small under the right NAICS code. Size is measured per contract, under the SBA size standard for the NAICS code in the notice. Check the codes you can perform in our guide to NAICS codes for contractors, and list them all in SAM.gov.
- Register in SAM.gov and keep it active. It is free and most awards require it. See SAM.gov registration.
- Read the RFQs in your codes and states every morning. With response times of days, the businesses that see the notice first are the ones that quote. BidFox does this for you: see tomorrow's email.
- Quote fast and complete. Use the government's own format, answer every line item, attach what Section L (or the "instructions to offerors" paragraph) asks for, and price from the wage determination when there is one. See how to price a government bid.
- Answer sources sought notices. Your response is the evidence of "two or more responsible small businesses" that keeps the job reserved. See how to respond to a sources sought notice.
- Introduce yourself to the buyers near you for the $15,000 to $25,000 purchases that never reach SAM.gov: the contracting office and small business specialist at each federal site in your area, with a one-page capability statement.
- Accept the purchase card so the same buyers can also use you under $15,000, and deliver well: these small jobs become the past performance for larger ones. See how to win your first government contract.
Comparing systems? See public works contracts in Spain vs the U.S..
Frequently asked questions
Is the small business reservation still $10,000 to $250,000?
No. Those were the thresholds from October 2020 to September 2025. Since October 1, 2025 the micro-purchase threshold is $15,000 and the simplified acquisition threshold is $350,000, so the reserved range is now $15,000 to $350,000. We checked the current text of FAR 2.101 on acquisition.gov on October 27, 2026 (FAC 2026-01, effective March 13, 2026).
Does the rule apply to construction contracts?
Yes, with a lower starting point. For construction covered by the Davis-Bacon wage rules the micro-purchase threshold is $2,000, so construction jobs from $2,000 up to $350,000 fall in the reserved range. Services covered by the Service Contract Labor Standards start at $2,500.
Are these contracts posted on SAM.gov?
Only above $25,000, with limited exceptions. Purchases between $15,000 and $25,000 are displayed publicly for at least 10 days but not necessarily on SAM.gov, and many are bought by quoting a few known vendors. Above $25,000 the notice must be published on SAM.gov, often as a short request for quotations or a combined synopsis/solicitation.
Do I need an SBA certification to bid on them?
No. The reservation at FAR 19.502-2(a) is for small businesses in general: you self-certify as small in SAM.gov under the size standard for the contract's NAICS code. Certifications (8(a), HUBZone, SDVOSB, WOSB) matter when the contracting officer uses one of those programs instead of a total small business set-aside.
Can the contracting officer skip the set-aside?
Yes, if they determine there is not a reasonable expectation of offers from two or more responsible small businesses that are competitive on price, quality and delivery. If only one acceptable offer comes from a small business they should still award to it; if none comes in, the set-aside is withdrawn and the job is resolicited open to all. Answering sources sought notices is how you show the contracting officer that two small businesses exist.
See the reserved jobs the day they post
Jobs in the reserved range have short deadlines and small competition. BidFox checks every notice on SAM.gov each morning and emails you the new ones for your trade and states, with the set-aside and the deadline on top. See a free sample alert, browse today's new notices, or read the companion guide to micro-purchase and simplified acquisition thresholds.
Sources: FAR 2.101 and 19.502-2 as published on acquisition.gov (FAC 2026-01, effective March 13, 2026), checked October 27, 2026; award figures from SAM.gov public data as processed by BidFox. The FAR is being rewritten under the Revolutionary FAR Overhaul and some agencies apply the new text through class deviations; the thresholds and the reservation are the same, section numbers can differ.
Last reviewed October 27, 2026. This guide is general information, not legal advice. Rules and dollar thresholds change, so check the solicitation and the official sources linked above.